Mainbrücke Ost II
 
 

News

 

TECCO® in the Sustainability Sector

 
Brugg, february 15, 2017
Geobrugg has extended its range of slope stabilization solutions with an additional component: TECCO® GREEN is the newest addition to TECCO® SYSTEM3, which promises growth in its literal sense.
» more

Efficiency thanks to the Lashing App

 
Brugg, february 15, 2017
The BRUGG Lashing App is a quick and more reliable solution for improving how loads are secured in trucks, and was specially developed as a service for truck drivers.
» more
 
 
 
 

Measuring the water level with centimeter precision

 
Brugg, february 15, 2017
Thanks to the highly precise measurement solutions offered by Rittmeyer, the level of the Storlivatnet reservoir can be determined to the exact centimeter, therefore optimizing electricity production.
» more
 
 

Installation in the Beznau substation

 
Brugg, february 15, 2017
Due to the Swiss energy and grid situation, the end customer Swissgrid has decided to install a new 380/220 kV transformer in the Beznau substation by winter 2016/17.
» more
 
 
 
 

District heating network for the city of Münster

 
Brugg, february 15, 2017
In 2014, Münster’s municipal utilities planned to connect two new district heating pipes (DN 800 / DA 1200) to the existing pipes at the harbor path/promenade and thermal storage tanks.
» more

A Polish success story

 
Brugg, february 15, 2017
For over 20 years, BRUGG Systemy Rurowe has experienced great success in the Polish market with our pipe systems for industry and gas stations.
» more
 
 
 
World record: 
ring net stops 16-tonne concrete block 
 
Geobrugg celebrates a new world record with its partners and clients.
 

 
 
 
 
 
 
 
 
Sitemap  |  Disclaimer  |  Recommend Page
Kabelwerke Brugg AG Holding
Industriestrasse 21
CH-5200 Brugg

Phone  +41 56 460 31 31
Fax +41 56 460 32 00